星期四, 五月 23, 2013
A Retrospective Timeline
Steps:
- Silently write down on sticky notes the major events that occurred
- Create a single timeline on a wall
- One by one, layout the notes in order of occurrence on the timeline
- Place positive events above the timeline and negative events below the timeline
- Discard duplicates
- Have one person walk through the final timeline
- One by one, rank the events on the timeline using dot voting
- Identify actions for the highest ranked events
- Rerun the time line with the actions and see what changes and if you get the desired outcome.
Steps (Chinese version):
回忆过去
•时间范围:2013/09/01 到2013/10/30•每个人回忆在这个阶段发生的让你印象深刻的事情。
•逐个把note贴在时间墙上。
•正面事件贴在时间轴上方, 负面事件贴在时间轴下方。
•避免重复事件。
•最后请一位同事回顾整个时间墙。
展望未来
•大家投票决定, 时间墙上的那些事件是我们团队的成就。
• 如果时间可以倒流,
•如果我有机会可以改变一些事情,
•你会改变什么?
•投票
•票数最高的前三位, 会付诸行动。
http://www.agilejourneyman.com/2012/01/timeline-retrospective.html
• 如果时间可以倒流,
•如果我有机会可以改变一些事情,
•你会改变什么?
•投票
•票数最高的前三位, 会付诸行动。
Remarks:
Very suitable to use after project ends or year end.
Reference:
http://www.thekua.com/rant/2006/03/a-retrospective-timeline/http://www.agilejourneyman.com/2012/01/timeline-retrospective.html